This job was straightforward enough but quite time consuming. The floor that we poured was at the rear of the house. To get our wheelbarrows to where the client wanted us to discharge, we had to go on a bit of an assault course to get there. Our operative Mick recalls the job fondly, “There was a ramp up to the front door, a ramp over a hole in the porch, through a lounge, over another plank and down in to the back garden. We then had to turn 180° and go back up another ramp in to the base. It wasn’t as easy as it first seemed.”
The job went well and the floor looked great. We later returned to the property to complete another floor, the porch and a small footing for a boundary wall.
The customer couldn’t have been happier.